Construction
History

We place the utmost priority on quality and environment,
and consider customer satisfaction above all else.

Korea
Title [Wastewater Treatment Plant]  Pipe connection and valve installation from Saongwon Won denitrification tank to 2 aeration tank
Owner
Field Area
Date
Attach a File file Capture4.PNG (730,640 KB, Download : 72)
file Capture5.PNG (1,384,432 KB, Download : 73)
file Capture6.PNG (1,580,396 KB, Download : 64)
file Capture7.PNG (966,377 KB, Download : 66)
Pipe connection and valve installation from Saongwon Won denitrification tank to 2 aeration tank [첨부 이미지1]

Pipe connection and valve installation from Saongwon Won denitrification tank to 2 aeration tank [첨부 이미지2]

Pipe connection and valve installation from Saongwon Won denitrification tank to 2 aeration tank [첨부 이미지3]

Pipe connection and valve installation from Saongwon Won denitrification tank to 2 aeration tank [첨부 이미지4]