Construction
History

We place the utmost priority on quality and environment,
and consider customer satisfaction above all else.

Korea
Title [Wastewater Treatment Plant]  Trial operation of Songlim Upflow Filter
Owner
Field Area
Date
Attach a File file Capture7.PNG (755,792 KB, Download : 51)
file Capture8.PNG (793,198 KB, Download : 52)
file 9.PNG (585,202 KB, Download : 67)
file Capture10.PNG (682,862 KB, Download : 58)
file Capture11.PNG (754,234 KB, Download : 53)
Trial operation of Songlim Upflow Filter [첨부 이미지1]

Trial operation of Songlim Upflow Filter [첨부 이미지2]

Trial operation of Songlim Upflow Filter [첨부 이미지3]

Trial operation of Songlim Upflow Filter [첨부 이미지4]

Trial operation of Songlim Upflow Filter [첨부 이미지5]