Construction
History

We place the utmost priority on quality and environment,
and consider customer satisfaction above all else.

Korea
Title [Wastewater Treatment Plant]  Intallation of the water treatment system
Owner Hus D***y
Field water treament plant Area
Date
Attach a File file Capture.PNG (925,223 KB, Download : 102)
file Capture2.PNG (1,852,054 KB, Download : 90)
file Capture3.PNG (1,814,039 KB, Download : 84)
file Capture4.PNG (1,361,700 KB, Download : 92)
file Capture5.PNG (1,144,366 KB, Download : 104)
Intallation of the water treatment system [첨부 이미지1]

Intallation of the water treatment system [첨부 이미지2]

Intallation of the water treatment system [첨부 이미지3]

Intallation of the water treatment system [첨부 이미지4]

Intallation of the water treatment system [첨부 이미지5]