Construction
History

We place the utmost priority on quality and environment,
and consider customer satisfaction above all else.

Korea
Title [Wastewater Treatment Plant]  Demolition of the 2nd factory sign structure
Owner
Field Area
Date
Attach a File file Capture.PNG (1,377,419 KB, Download : 67)
file Capture2.PNG (1,846,028 KB, Download : 59)
file Capture3.PNG (1,861,297 KB, Download : 71)
file Capture4.PNG (1,676,988 KB, Download : 66)
file Capture5.PNG (1,562,972 KB, Download : 64)
Demolition of the 2nd factory sign structure [첨부 이미지1]

Demolition of the 2nd factory sign structure [첨부 이미지2]

Demolition of the 2nd factory sign structure [첨부 이미지3]

Demolition of the 2nd factory sign structure [첨부 이미지4]

Demolition of the 2nd factory sign structure [첨부 이미지5]